Blog

Technical Innovation: “From stone to the block”

Between 2018 and 2020, GOYER is building the facades of the LANDSCAPE project, rehabilitation of the PASCAL Towers. The heavy renovation of the towers was launched in 2017 by ALTAREA COGEDIM, under the direction of the architect Dominique PERRAULT, the facade advice being entrusted to ARCORA. It offers more than 70,000 m² of surface area, including 65,000 m² of offices.

GOYER is installing 34,800m² of block-panel facades, in a consortium with EIFFAGE Grands Projets.

The particular and original design consisted of embedding the Micashist facing stones in the blocks. The GOYER design office and technical department, in collaboration with the company UNI-MARBRES, have developed the ad-hoc technical solution (validated by an ATEX), allowing us to carry out this project.

Once again, our industrial concept of prefabrication enabled us to build a relevant technical solution, and to win the market for this prestigious rehabilitation. This operation, appears in the top 3 of GOYER references, for its scale.

We are proud to have participated in this great project, and thank ALTAREA COGEDIM and Dominique PERRAULT for their trust.